SemiMedia SemiMedia
  • Breaking News
  • MarketWatch
  • Distribution
  • Manufacturer
  • Video
  • About us
Home › MarketWatch › TSMC's Kumamoto second fab construction delayed, production set for 2027
  • 0

TSMC's Kumamoto second fab construction delayed, production set for 2027

SemiMediaEdit
February 25, 2025

February 25, 2025 /SemiMedia/ — TSMC's Japanese subsidiary, JASM (Japan Advanced Semiconductor Manufacturing), plans to build a second wafer fab in Kumamoto. While construction may begin later than initially expected in the first quarter of 2025, production is still slated to start by the end of 2027.

The new facility will be located east of the first fab, covering 321,000 square meters and costing approximately ¥2.1 trillion (around $14.04 billion). It will focus on the production of 6nm process node chips. JASM President Yuichi Horita confirmed at the 2025 Kumamoto Industry Revitalization Expo that despite potential delays, the production timeline remains intact.

JASM’s Kumamoto first fab began mass production in 2024, with plans to expand capacity in the coming years. Horita emphasized the company's goal of increasing Japan’s semiconductor material procurement rate to 60% by 2030 and expressed hopes for deeper cooperation between Taiwanese manufacturers and local Kumamoto businesses to foster investments in advanced materials production.

Related

6nm semiconductor production advanced semiconductor materials electronic components news Japan semiconductor industry Japan semiconductor materials JASM fab construction delay Kumamoto semiconductor facility semiconductor capacity expansion semiconductor news semiconductor wafer manufacturing TSMC Japan investment TSMC Kumamoto fab
TI launches industry's first space-grade 200V GaN FET gate driver, enabling smaller and more efficient satellites
Previous
SK hynix set to complete acquisition of Intel’s NAND business
Next

All Comments (0)

Back
No Comment.

Top Post

Mouser Electronics expands to the Philippines with local customer service center
Qualcomm ranked first in the world's top ten IC design companies
Fire broke out at AKM factory in Japan
onsemi expects to produce 200mm SiC wafers by 2025
TSMC’s CoWoS capacity to reach 75,000 wafers/month by end-2025
SEMI: Global semiconductor equipment sales are expected to hit a new record in 2024

Subscribe SemiMedia

Please check your E-mail to confirm the subscribtion.

Related posts

TrendForce Cuts 2027 Forecasts as DRAM and NAND Outlooks Diverge

TrendForce Cuts 2027 Forecasts as DRAM and NAND Outlooks Diverge

November 26, 2026
0
NVIDIA B300 Lead Times Reportedly Reach 40 Weeks as Gaming GPU Supply Tightens

NVIDIA B300 Lead Times Reportedly Reach 40 Weeks as Gaming GPU Supply Tightens

November 26, 2026
0
TSMC Considers Texas Site for 2 nm Chip Manufacturing

TSMC Considers Texas Site for 2 nm Chip Manufacturing

November 26, 2026
0
Samsung Reportedly Targets Fivefold Increase in Xian V9 NAND Capacity

Samsung Reportedly Targets Fivefold Increase in Xian V9 NAND Capacity

November 25, 2026
0
Copyright © 2017-2026 SemiMedia. Designed by nicetheme.
  • Breaking News
  • MarketWatch
  • Distribution
  • Manufacturer
  • Video
  • About us
  • electronic components news
  • Electronic components supplier
  • Electronic parts supplier
  • Electronic components distributor
  • Infineon
  • Electronic component news
  • Renesas
  • Vishay
  • STMicroelectronics
  • NXP

SemiMediaEdit

Administrator