SemiMedia SemiMedia
  • Breaking News
  • MarketWatch
  • Distribution
  • Manufacturer
  • Video
  • About us
Home › MarketWatch › TSMC's Kumamoto second fab construction delayed, production set for 2027
  • 0

TSMC's Kumamoto second fab construction delayed, production set for 2027

SemiMediaEdit
February 25, 2025

February 25, 2025 /SemiMedia/ — TSMC's Japanese subsidiary, JASM (Japan Advanced Semiconductor Manufacturing), plans to build a second wafer fab in Kumamoto. While construction may begin later than initially expected in the first quarter of 2025, production is still slated to start by the end of 2027.

The new facility will be located east of the first fab, covering 321,000 square meters and costing approximately ¥2.1 trillion (around $14.04 billion). It will focus on the production of 6nm process node chips. JASM President Yuichi Horita confirmed at the 2025 Kumamoto Industry Revitalization Expo that despite potential delays, the production timeline remains intact.

JASM’s Kumamoto first fab began mass production in 2024, with plans to expand capacity in the coming years. Horita emphasized the company's goal of increasing Japan’s semiconductor material procurement rate to 60% by 2030 and expressed hopes for deeper cooperation between Taiwanese manufacturers and local Kumamoto businesses to foster investments in advanced materials production.

Related

6nm semiconductor production advanced semiconductor materials electronic components news Japan semiconductor industry Japan semiconductor materials JASM fab construction delay Kumamoto semiconductor facility semiconductor capacity expansion semiconductor news semiconductor wafer manufacturing TSMC Japan investment TSMC Kumamoto fab
TI launches industry's first space-grade 200V GaN FET gate driver, enabling smaller and more efficient satellites
Previous
SK hynix set to complete acquisition of Intel’s NAND business
Next

All Comments (0)

Back
No Comment.

Top Post

Mouser Electronics expands to the Philippines with local customer service center
Fire broke out at AKM factory in Japan
Qualcomm ranked first in the world's top ten IC design companies
TSMC’s CoWoS capacity to reach 75,000 wafers/month by end-2025
Analyze the key factors and prospects of electronic components shortage from the perspective of wafer industry
onsemi expects to produce 200mm SiC wafers by 2025

Subscribe SemiMedia

Please check your E-mail to confirm the subscribtion.

Related posts

Intel lifts margins by selling lower-grade chips as AI demand tightens CPU supply

Intel lifts margins by selling lower-grade chips as AI demand tightens CPU supply

April 28, 2026
0
ROHM launches NFC wireless power chipset for compact wearables

ROHM launches NFC wireless power chipset for compact wearables

April 28, 2026
0
Omdia sees 62.7% semiconductor revenue growth in 2026

Omdia sees 62.7% semiconductor revenue growth in 2026

April 28, 2026
0
Samsung wafer output drops 58%, memory down 18% amid labor dispute

Samsung wafer output drops 58%, memory down 18% amid labor dispute

April 27, 2026
0
Copyright © 2017-2026 SemiMedia. Designed by nicetheme.
  • Please set up your first menu at [Admin -> Appearance -> Menus]
  • electronic components news
  • Electronic components supplier
  • Electronic parts supplier
  • Infineon
  • Electronic component news
  • Electronic components distributor
  • Renesas
  • Vishay
  • STMicroelectronics
  • NXP

SemiMediaEdit

Administrator