SemiMedia SemiMedia
  • Breaking News
  • MarketWatch
  • Distribution
  • Manufacturer
  • Video
  • About us
Home › MarketWatch › Capacity of Renesas’s Naka factory has returned to 100% of pre-fire level
  • 0

Capacity of Renesas’s Naka factory has returned to 100% of pre-fire level

SemiMediaEdit
June 25, 2021

Renesas Electronics today announced an update regarding production capacity recovery following the occurrence of a fire on March 19, 2021 at part of the processes in the N3 Building (300mm line) of Naka Factory.

The announcement stated that the start-up of all necessary manufacturing equipment to recover pre-fire production capacity of the N3 Building, which resumed operation on April 17, has been completed. As a result, the production level of the N3 Building has returned to 100% of the pre-fire level as of the evening of June 24. In addition, alternative production is contributing to Renesas’ manufacturing as planned.

Renesas expects that the shipment level of the products manufactured in the N3 Building to return to pre-fire level around the third week of July. However, this shipment level refers to that of the N3 Building as a whole. Therefore, the recovery timing of the shipment level may vary from product to product.

Related

electronic components news Renesas fire Renesas Naka factory
ST launches configurable automotive low-dropout regulators to provide diagnostics for functional safety
Previous
ST and Tower Semiconductor collaborate to accelerate wafer mass production in Italy
Next

All Comments (0)

Back
No Comment.

Top Post

Mouser Electronics expands to the Philippines with local customer service center
Fire broke out at AKM factory in Japan
Qualcomm ranked first in the world's top ten IC design companies
TSMC’s CoWoS capacity to reach 75,000 wafers/month by end-2025
onsemi expects to produce 200mm SiC wafers by 2025
Analyze the key factors and prospects of electronic components shortage from the perspective of wafer industry

Subscribe SemiMedia

Please check your E-mail to confirm the subscribtion.

Related posts

ADATA expects memory shortage to continue as AI demand grows

ADATA expects memory shortage to continue as AI demand grows

May 8, 2026
0
Micron says AI memory shortage could last until 2028

Micron says AI memory shortage could last until 2028

May 8, 2026
0
Global chip sales jump 79% in March as AI demand stays strong

Global chip sales jump 79% in March as AI demand stays strong

May 8, 2026
0
Vishay launches compact proximity sensor with 600 mm detection

Vishay launches compact proximity sensor with 600 mm detection

May 7, 2026
0
Copyright © 2017-2026 SemiMedia. Designed by nicetheme.
  • Please set up your first menu at [Admin -> Appearance -> Menus]
  • electronic components news
  • Electronic components supplier
  • Electronic parts supplier
  • Infineon
  • Electronic component news
  • Electronic components distributor
  • Renesas
  • Vishay
  • STMicroelectronics
  • NXP

SemiMediaEdit

Administrator