SemiMedia SemiMedia
  • Breaking News
  • MarketWatch
  • Distribution
  • Manufacturer
  • Video
  • About us
Home › MarketWatch › Fire broke out at Renesas Naka factory
  • 0

Fire broke out at Renesas Naka factory

SemiMediaEdit
March 22, 2021

On March 19, Renesas Electronics announced the occurrence of a fire on March 19, 2021 at 2:47 am at part of the processes in the N3 Building (300mm line) of Naka Factory (located in Hitachinaka, Ibaraki Prefecture) of Renesas Semiconductor Manufacturing Co., Ltd, a wholly-owned manufacturing subsidiary of Renesas. The fire was extinguished at 8:12 am on March 19, 2021.

According to the announcement, although the building was not damaged, some practical equipment (such as pure water supply and air conditioning) and some manufacturing equipment were damaged.

The burned area is approximately 600m2, which is around 5% of the 12,000m2 clean room area of the first floor N3 Building, and the burned manufacturing equipment was 11 units, which is around 2% of the manufacturing equipment of the N3 Building. The impacts to work-in-process is undetermined and Renesas said it will conduct an investigation next week.

Production in the N3 building (300mm production line) is temporarily suspended. Renesas said that with the support of partner companies and manufacturing equipment suppliers, it will clean the interior of the clean room and purchase new equipment to replace the burned-out equipment. Its goal is to resume production within one month.

It is worth noting that Renesas previously stated that the shortage of automotive chips may continue into the second half of 2021. The fire may make the situation worse, because semiconductor manufacturing takes three months, once interrupted by interference, it is quite difficult to restart.

Related

electronic components news Renesas factory fire Renesas Naka factory
Infineon plans to invest 1.1 billion euros in the Dresden fab in the next five years
Previous
Vishay released new high-voltage thick film chip resistors, reducing the number of components and PCB size
Next

All Comments (0)

Back
No Comment.

Top Post

Fire broke out at AKM factory in Japan
Mouser Electronics expands to the Philippines with local customer service center
Qualcomm ranked first in the world's top ten IC design companies
Analyze the key factors and prospects of electronic components shortage from the perspective of wafer industry
What is the root cause of the decline of the Japanese semiconductor industry?
ST releases price increase notice

Subscribe SemiMedia

Please check your E-mail to confirm the subscribtion.

Related posts

Samsung DRAM market share slips under 40% for first time in ten years

Samsung DRAM market share slips under 40% for first time in ten years

August 21, 2025
0
150 mm CMOS exit accelerates migration to 350 nm as key node

150 mm CMOS exit accelerates migration to 350 nm as key node

August 21, 2025
0
Diotec launches SiC Schottky diode for fast MOSFET short-circuit protection

Diotec launches SiC Schottky diode for fast MOSFET short-circuit protection

August 20, 2025
0
TSMC sets $30,000 price for 2nm wafers, targets AI and HPC clients

TSMC sets $30,000 price for 2nm wafers, targets AI and HPC clients

August 20, 2025
0
5
Copyright © 2017-2025 SemiMedia. Designed by nicetheme.
  • Please set up your first menu at [Admin -> Appearance -> Menus]
  • electronic components news
  • Electronic components supplier
  • Electronic parts supplier
  • Infineon
  • Electronic component news
  • Renesas
  • Vishay
  • STMicroelectronics
  • NXP
  • TDK

SemiMediaEdit

Administrator